When it comes to delivering large tanks, ensuring the right lifting equipment is available on-site is crucial for a safe and efficient process. Depending on the size and type of the tank, as well as its fittings, different lifting gear may be required. In this article, we’ll outline the specific requirements to help you prepare for your delivery.

Ensuring a Smooth Delivery of Polymaster Products: A Comprehensive Guide to Lifting Equipment

When it comes to delivering Polymaster products, having the right lifting equipment on-site is crucial for a safe and efficient process. Our range of products varies in size and weight, which means different lifting gear may be required for different items. This guide will help you prepare for your delivery by outlining the specific lifting equipment needs based on the product.

Rest assured our specialised logistics team will walk you through all the requirements for a safe and straightforward delivery process.

Why Lifting Equipment is Important

Our products can be substantial in both size and weight. Without the proper equipment, unloading these items can be challenging and potentially dangerous. Using the right lifting gear helps prevent damage to the product and ensures the safety of everyone involved.

Detailed Lifting Requirements by Product

Here is a detailed list of our products along with the required lifting equipment:

1. Forklift Required

  • Slimline Rainwater Tanks (2,000L and above)
  • AdBlue Slimline Tanks (3,000L and above)
  • AdBlue Bunded Tanks (2,300L to 3,300L)
  • 3,100L Septic Tanks and 3,300L Underground Tanks
  • Pump Stations and Pump Wells
  • Bulka Bins
  • Diesel & Fluid Transfer Tanks
  • 2,000L Aquaculture Tanks

2. Forklift with Extensions (2.5m) Required

  • 4,550L Septic tanks and 5,000L Underground Tanks
  • Process Tanks up to 10,000L
  • Diesel Storage Tanks (5,000L and above)
  • AdBlue Tanks (5,000L and above)
  • Aquaculture Tanks (5,000L and above)
  • Troughs (2,400L and above)
  • Trailer Packages

3. Crane Required

  • Liquid Fertiliser Tanks
  • Process Tanks (13,600L and above)
  • Chemical Smooth Wall Tanks (13,500L and above)
  • Cone Bottom Tanks

Preparing for Delivery

To ensure a smooth delivery process, please review the lifting requirements and ensure the appropriate equipment is available on-site:

  • Site Preparation: Clear the delivery site of obstacles and ensure it has a firm, level surface suitable for placing the product.
  • Access Clearance: Delivery trucks are large and require ample space for manoeuvring. Check for low-hanging branches or power lines that might obstruct the truck’s path.
  • Communication: Keep in touch with our delivery team, providing detailed information about the site and any specific requirements.

If you do not have access to the necessary equipment, consider arranging rental equipment or hiring a professional service to assist with unloading. Related: Check out our latest article on How do I service and protect my Diesel and AdBlue® Bunded Tank?

Need Help?

If you have any questions about lifting requirements or need further assistance in preparing for your delivery, please contact our customer service team. We’re committed to ensuring that your products arrive safely and are installed without any issues.

Water Tank Blog

Trusted by Australian Businesses to Deliver These Projects

Polymaster’s slimline water tanks are manufactured to the highest quality standards, hold product certification from an independent testing authority, and are trusted by some of Australia’s most recognised organisations and developers.

Ask a specialist

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Ask A Specialist Form

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Cow Popup